A bill of materials becomes a production order. The work is planned, scheduled on your machines or sent to a job worker, run on the shop floor, and received back into stock.
In the Manufacturing plan
Planning the make
What a product is made of, how it is made, what it should cost, and what to buy or make to keep the floor fed.
A bill of materials, operation by operation, each with the materials it uses.A costing order: the cost stack, margin and sale price.The material plan: what to buy and make, and by when.
🧱
Bills of materials and routing
One active BOM per finished good, its lines grouped by operation. The routing puts each operation at a work centre with setup and run time, or outside with lead days. A production order pins the BOM version and copies the routing, so later changes touch only new orders.
💲
Job rates and wastages
Each operation priced per contractor, unit and quantity band from an effective date. A wastage allowance per operation and material is added to what is issued — and never taken off the contractor’s pay.
🧮
Costing orders
Cost a product from its operations at contractor rates, overheads and materials: total, cost per unit, sale price and margin. Approving the costing sets the item’s standard cost and sale price and keeps the history; a made item cannot be received or issued until it has one.
📅
Material requirements planning
Four to twenty-six weeks ahead: requirements from job, production and sale orders, exploded through the BOMs and netted against stock, transit and open orders, to safety stock with lead times. Confirming raises draft purchase and production orders.
Work centres and machines
Where the work is done, what each machine costs to run, and when it is free to run.
A work centre: its machines, hours, cost per hour and rated output.The calendar: each machine’s available hours, day by day.
🏭
Work centres
Work centres per unit with a cost per hour, rated output, a department and whether they work on holidays — run on machines or as a manual bench.
🛠️
Machines from the asset register
A machine is made from an active fixed asset, with make, model, warranty, service contract and status, and a dated history of every move. Its machine-hour rate can be proposed from the asset’s depreciation over the hours its calendar gives it.
Which operations each machine performs, at a rate per hour, batch or cycle with setup minutes. Weekly shifts per work centre, dated closures, extra hours and maintenance windows, and the unit’s holidays.
👷
Operators and crews
Each work centre has a pool of operators with their skills and leave, and each machine a crew size. Planning gives a machine hours only when enough of its crew is in, puts skilled operators first, and leave never stops a run you start by hand.
🔧
Preventive maintenance
Plans per machine, every so many days or running hours. Due and overdue plans are listed and e-mailed daily; scheduling one blocks the machine’s calendar so nothing is booked over it. Every breakdown is kept as unplanned maintenance.
🚦
Only a working machine takes work
A machine that is down, under maintenance or retired is never offered, booked or started. A breakdown can mark it down, and shows the bookings that now need moving.
In-house job orders
A production order is carried out by job orders, one per operation. Worked in-house, a job order books your machines and runs on your floor.
An in-house job order: its operations, rates and materials.A production order with its routing and the job orders raised from it.
🎯
One performer per job order
Each job order is worked by one performer — your own unit or a contractor — and each operation of a production order is commissioned once.
📤
Material issued on release
Approving a job order raises its goods issue: the BOM’s materials plus wastage, lots picked first-expiry-first-out, debited to work in progress. Further issues and returns of unused material go against the same job order.
For each operation in routing order: its bookings, whether a machine is running it now, actual against planned hours, good and rejected against the quantity, and stops by reason.
⏱️
Completion estimates
Every production and job order shows when it will finish and why — from its bookings, or its remaining hours laid on each work centre’s calendar — and how many days late that is against the due date.
✂️
Close short
A Processing order that will make no more is closed short with a reason. Its job orders complete, their machine bookings are released, and the work in progress left on it is written off.
🌳
Lot genealogy
A finished lot is linked to every lot issued to its job orders, and to where it went next.
Contractor job work
Send an operation to a job worker — printing, sterilisation, stitching — and keep the material, the rate and the bill in step.
A contractor’s job order for EtO sterilisation, due back on a set date.Job rates per contractor and quantity band, in-house and outside.
🤝
Contractor job orders
Pick a contractor that has a job rate for the operation. Its material is issued to the contractor, and the work comes back on the production receipt that names them.
📇
Rate cards by quantity band
The rate is the band covering the quantity at the latest effective date. The contractor’s rate card is shown on the job order with that band marked.
🚐
Outside steps
An outside step such as EtO sterilisation or gamma irradiation books no machine hours and adds its lead days. The schedule board shows what is out with each contractor and when it is due back.
🧾
The bill clears the accrual
Contractor conversion is accrued at standard when the goods come back. A bill naming the job order clears that accrual, and once the job order completes, any difference posts to job-work price variance.
Finished goods go into stock at standard cost, and every difference from it lands on its own account.
Work in progress by production order, tied to the account.Cost drift: where actual cost has moved away from the standard.
📥
Received at standard cost
Finished goods are valued at the standard set by their approved costing. The receipt posts Dr finished goods, Cr work in progress for material, Cr accrued job work for contractors and Cr conversion absorbed for your own work.
What each production order holds in work in progress — issued, returned, relieved by receipts, written off — with its vouchers, set against the work-in-progress account.
When an order is complete, its in-house runs are costed at each machine’s hourly rate and set against the conversion absorbed at standard; the difference posts to conversion variance.
📉
Production variance
Work in progress left on a completed order — closed short, or issued after its final receipt — is written off to production variance, beside cost of goods sold.
📈
Cost drift and recost
Per finished item over a period: the standard its receipts put into stock against what it actually cost, the drift as a percentage, and past your threshold a proposed new standard. Costings priced at an out-of-date standard are listed for recost.
The schedule
The schedule board: a week of runs on every machine.
📊
Load view
Load against available hours for every work centre and day, with over-capacity flagged and orders that do not fit the calendar listed.
🗓️
Schedule board
Every machine on a timeline. Drag a job to a new time or another capable machine; the move is checked for overlaps, operator double-booking and step order.
🤖
Auto-schedule
Up to thirty orders, earliest due first, each step on the capable machine that finishes it soonest within free working time. You confirm the whole proposal or none of it.
⏸️
Waits for what it needs
An operation that uses something you make yourself is not planned before the orders making it are expected to finish — and the plan says what it is waiting for.
✨
Re-plan with the assistant
When the floor overtakes the plan, the board drafts a request to the AI assistant to re-plan or reschedule; nothing is booked until you confirm.
Utilisation and OEE for a week, by work centre, with idle time by reason.
🟢
Live machine tiles
Every machine idle, running, paused, stopped or down, with its clock, refreshed every thirty seconds.
▶️
Runs
Start a run of a released job order with its operator, one open run per machine. Pause with a reason; stop with good and rejected quantities, rejects typed from your defect list.
⛔
Downtime with reasons
Every stop recorded as planned or unplanned with its reason, and a day timeline of why machines stood.
📈
Utilisation and OEE
Available, running and idle hours by machine and work centre, idle time by reason with the unexplained part on its own line, and OEE as availability × performance × quality.
The production dashboard
Output, open work and the floor in one place: OEE week by week, utilisation per work centre, where idle hours went, downtime by kind, and orders by status. Each chart can be drawn as bars, lines, areas, pies or donuts.
OEE by work centre, week by week, as an area chart.Utilisation per work centre this month, as bars.Where idle hours went this month, unexplained hours on their own, as a donut.Downtime over the last seven days by kind of stop, as a pie.Production orders by status, as a donut.Job orders by status, as bars.
Screens from a Tathven Agentic ERP demo company, Matrix Biotech.
See Tathven Agentic ERP running on your own numbers
Tell us what you run today. We will show Tathven Agentic ERP working on a sample of your own
data, then send a written scope and quotation — not a brochure.