Bills of materials
BOMs per operation, where each line knows the part it plays. A production order pins the BOM version and routing it was raised with.
A bill of materials becomes a production order. The work is planned, scheduled on your machines or sent to a job worker, run on the shop floor, and received back into stock.
In the Manufacturing plan
BOMs per operation, where each line knows the part it plays. A production order pins the BOM version and routing it was raised with.
A cost for every operation and an expected loss, so wastage is planned rather than discovered.
Cost a job before you quote it. The approved cost sheet sets the item’s cost and price, and can need a controller’s approval above a threshold.
Four to twenty-six weeks ahead: requirements from job, production and sale orders, exploded through the BOMs and netted against stock, transit and open orders, to safety stock with lead times. Confirming raises draft purchase and production orders.
The instruction to make a finished good, closed by its finished-goods receipt into stock at the cost the costing order set.
Each operation has one performer — your own unit or a contractor. Approving the job order raises its goods issue, and its status follows the work through to completion.
Job workers are stakeholders like everyone else, and ITC-04 is prepared from what you sent them and what came back.
MoreIssued material sits in work in progress until the finished goods are received; a contractor’s bill clears its job-work accrual, and unused material returns out of WIP. See work in progress by order at any time.
MoreClose an order short with a reason and the work in progress left on it goes to a variance. Once an order is complete, its machine time at each machine’s hourly rate is set against what was absorbed, and the difference posts to its own variance account.
MoreWhich lots went into a produced batch, and where that batch went.
Work centres with a cost per hour, machines taken from the fixed-asset register, what each can do and how fast, and a calendar of shifts, closures and maintenance.
Load against available hours for every work centre and day, with over-capacity flagged and orders that do not fit the calendar listed.
Every machine on a timeline. Drag a job to a new time or another capable machine; the move is checked for overlaps, operator double-booking and step order.
Each work centre has a pool of operators with their skills and leave, and each machine a crew size. Planning gives a machine hours only when enough of its crew is in, puts skilled operators first, and leave never stops a run you start by hand.
Up to thirty orders, earliest due first, each step on the capable machine that finishes it soonest within free working time. You confirm the whole proposal or none of it.
Every machine idle, running, paused, stopped or down, with its clock.
Start a run with its operator, pause with a reason, stop with good and rejected quantities — and a stop is refused until the required in-process checks are recorded.
Every stop recorded as planned or unplanned with its reason, and a day timeline of why machines stood.
Available, running and idle hours, idle time by reason with the unexplained part on its own line, and OEE as availability × performance × quality.