HR
FIN
SCM
CRM
PM
DB
ERP
TATHVEN AGENTIC ERP
Tathven Agentic ERP · all modules
Production

From bill of materials to finished goods

A bill of materials becomes a production order. The work is planned, scheduled on your machines or sent to a job worker, run on the shop floor, and received back into stock.

In the Manufacturing plan

Planning the make

What a product is made of, how it is made, what it should cost, and what to buy or make to keep the floor fed.

Bill of materials expanded: a finished good’s operations, each with its raw materials
A bill of materials, operation by operation, each with the materials it uses.
Costing order detail: total cost, margin and sale price, then each operation and raw material with rate and amount
A costing order: the cost stack, margin and sale price.
Material plan for thirteen weeks: items to buy and make, late items, and when to order each
The material plan: what to buy and make, and by when.

Bills of materials and routing

One active BOM per finished good, its lines grouped by operation. The routing puts each operation at a work centre with setup and run time, or outside with lead days. A production order pins the BOM version and copies the routing, so later changes touch only new orders.

Job rates and wastages

Each operation priced per contractor, unit and quantity band from an effective date. A wastage allowance per operation and material is added to what is issued — and never taken off the contractor’s pay.

Costing orders

Cost a product from its operations at contractor rates, overheads and materials: total, cost per unit, sale price and margin. Approving the costing sets the item’s standard cost and sale price and keeps the history; a made item cannot be received or issued until it has one.

Material requirements planning

Four to twenty-six weeks ahead: requirements from job, production and sale orders, exploded through the BOMs and netted against stock, transit and open orders, to safety stock with lead times. Confirming raises draft purchase and production orders.

Work centres and machines

Where the work is done, what each machine costs to run, and when it is free to run.

Work centre detail: RF welding hall with seven machines, hours a week, cost per hour and each machine’s rate
A work centre: its machines, hours, cost per hour and rated output.
Work centre calendar: available hours by machine and day for two weeks, with closed days and maintenance
The calendar: each machine’s available hours, day by day.

Work centres

Work centres per unit with a cost per hour, rated output, a department and whether they work on holidays — run on machines or as a manual bench.

Machines from the asset register

A machine is made from an active fixed asset, with make, model, warranty, service contract and status, and a dated history of every move. Its machine-hour rate can be proposed from the asset’s depreciation over the hours its calendar gives it.

More

Capabilities and calendar

Which operations each machine performs, at a rate per hour, batch or cycle with setup minutes. Weekly shifts per work centre, dated closures, extra hours and maintenance windows, and the unit’s holidays.

Operators and crews

Each work centre has a pool of operators with their skills and leave, and each machine a crew size. Planning gives a machine hours only when enough of its crew is in, puts skilled operators first, and leave never stops a run you start by hand.

Preventive maintenance

Plans per machine, every so many days or running hours. Due and overdue plans are listed and e-mailed daily; scheduling one blocks the machine’s calendar so nothing is booked over it. Every breakdown is kept as unplanned maintenance.

Only a working machine takes work

A machine that is down, under maintenance or retired is never offered, booked or started. A breakdown can mark it down, and shows the bookings that now need moving.

In-house job orders

A production order is carried out by job orders, one per operation. Worked in-house, a job order books your machines and runs on your floor.

In-house job order detail: performer, finished good, quantity, each operation with its rate and the raw materials issued
An in-house job order: its operations, rates and materials.
Production order detail: the finished good, routing, job orders raised and operations
A production order with its routing and the job orders raised from it.

One performer per job order

Each job order is worked by one performer — your own unit or a contractor — and each operation of a production order is commissioned once.

Material issued on release

Approving a job order raises its goods issue: the BOM’s materials plus wastage, lots picked first-expiry-first-out, debited to work in progress. Further issues and returns of unused material go against the same job order.

More

Every operation tracked

For each operation in routing order: its bookings, whether a machine is running it now, actual against planned hours, good and rejected against the quantity, and stops by reason.

Completion estimates

Every production and job order shows when it will finish and why — from its bookings, or its remaining hours laid on each work centre’s calendar — and how many days late that is against the due date.

Close short

A Processing order that will make no more is closed short with a reason. Its job orders complete, their machine bookings are released, and the work in progress left on it is written off.

Lot genealogy

A finished lot is linked to every lot issued to its job orders, and to where it went next.

Contractor job work

Send an operation to a job worker — printing, sterilisation, stitching — and keep the material, the rate and the bill in step.

Contractor job order: EtO sterilisation at a contractor, the rate and material, and when it is due back
A contractor’s job order for EtO sterilisation, due back on a set date.
Job rate matrix: each operation’s rate per contractor and quantity band
Job rates per contractor and quantity band, in-house and outside.

Contractor job orders

Pick a contractor that has a job rate for the operation. Its material is issued to the contractor, and the work comes back on the production receipt that names them.

Rate cards by quantity band

The rate is the band covering the quantity at the latest effective date. The contractor’s rate card is shown on the job order with that band marked.

Outside steps

An outside step such as EtO sterilisation or gamma irradiation books no machine hours and adds its lead days. The schedule board shows what is out with each contractor and when it is due back.

The bill clears the accrual

Contractor conversion is accrued at standard when the goods come back. A bill naming the job order clears that accrual, and once the job order completes, any difference posts to job-work price variance.

More

Contractors on the same master

Job workers are stakeholders like everyone else, and ITC-04 is prepared from what you sent them and what came back.

More

Cost of goods and variances

Finished goods go into stock at standard cost, and every difference from it lands on its own account.

Work in progress as at a date: the account balance, what each production order holds, and orders that need attention
Work in progress by production order, tied to the account.
Cost drift: finished goods whose actual cost per unit has moved from standard, with a proposed new standard
Cost drift: where actual cost has moved away from the standard.

Received at standard cost

Finished goods are valued at the standard set by their approved costing. The receipt posts Dr finished goods, Cr work in progress for material, Cr accrued job work for contractors and Cr conversion absorbed for your own work.

More

Cost of goods sold

A sale posts its cost of goods sold at the finished good’s standard cost.

More

Work in progress by order

What each production order holds in work in progress — issued, returned, relieved by receipts, written off — with its vouchers, set against the work-in-progress account.

More

Conversion variance

When an order is complete, its in-house runs are costed at each machine’s hourly rate and set against the conversion absorbed at standard; the difference posts to conversion variance.

Production variance

Work in progress left on a completed order — closed short, or issued after its final receipt — is written off to production variance, beside cost of goods sold.

Cost drift and recost

Per finished item over a period: the standard its receipts put into stock against what it actually cost, the drift as a percentage, and past your threshold a proposed new standard. Costings priced at an out-of-date standard are listed for recost.

The schedule

Schedule board for a week: every machine on a timeline with runs, stops and planned work
The schedule board: a week of runs on every machine.

Load view

Load against available hours for every work centre and day, with over-capacity flagged and orders that do not fit the calendar listed.

Schedule board

Every machine on a timeline. Drag a job to a new time or another capable machine; the move is checked for overlaps, operator double-booking and step order.

Auto-schedule

Up to thirty orders, earliest due first, each step on the capable machine that finishes it soonest within free working time. You confirm the whole proposal or none of it.

Waits for what it needs

An operation that uses something you make yourself is not planned before the orders making it are expected to finish — and the plan says what it is waiting for.

Re-plan with the assistant

When the floor overtakes the plan, the board drafts a request to the AI assistant to re-plan or reschedule; nothing is booked until you confirm.

More

The shop floor

Machine utilisation for a week: 67% utilised, OEE 68%, by work centre, with idle time by logged reason
Utilisation and OEE for a week, by work centre, with idle time by reason.

Live machine tiles

Every machine idle, running, paused, stopped or down, with its clock, refreshed every thirty seconds.

Runs

Start a run of a released job order with its operator, one open run per machine. Pause with a reason; stop with good and rejected quantities, rejects typed from your defect list.

Downtime with reasons

Every stop recorded as planned or unplanned with its reason, and a day timeline of why machines stood.

Utilisation and OEE

Available, running and idle hours by machine and work centre, idle time by reason with the unexplained part on its own line, and OEE as availability × performance × quality.

The production dashboard

Output, open work and the floor in one place: OEE week by week, utilisation per work centre, where idle hours went, downtime by kind, and orders by status. Each chart can be drawn as bars, lines, areas, pies or donuts.

OEE trend widget as an area chart: overall equipment effectiveness by work centre, week by week over eight weeks
OEE by work centre, week by week, as an area chart.
Utilisation by work centre widget as a bar chart: running hours as a share of available hours, per work centre
Utilisation per work centre this month, as bars.
Top idle reasons widget as a donut: where the machines’ idle hours went this month
Where idle hours went this month, unexplained hours on their own, as a donut.
Downtime by kind widget as a pie: minutes machines stood over the last seven days, by kind of stop
Downtime over the last seven days by kind of stop, as a pie.
Production orders by status widget as a donut: processing and completed
Production orders by status, as a donut.
Job orders by status widget as a bar chart: processing and completed
Job orders by status, as bars.
Output today: runs and rejection Active BOMs Overloaded days in the next fourteen Pending approval

Screens from a Tathven Agentic ERP demo company, Matrix Biotech.

Request a demo

See Tathven Agentic ERP running on
your own numbers

Tell us what you run today. We will show Tathven Agentic ERP working on a sample of your own data, then send a written scope and quotation — not a brochure.

Tathven AI Private Limited Tathven Agentic ERP · Tathven HRMS · Tathven AI Workspaces · Tathven CRM, all AI enabled

Tathven AI Private Limited · 236, Ramakrishna Mutt Road, Raja Annamalai Puram, Chennai 600 028, Tamil Nadu · +91 44 7964 7424 · Monday to Friday, 9:30 AM – 6:30 PM IST

© 2026 Tathven AI Private Limited. Tathven Agentic ERP, Tathven HRMS, Tathven AI Workspaces and Tathven CRM are products of Tathven AI Private Limited.